Technology consulting
01
Engineering solutions
We accompany each project at all stages: from the first laboratory tests to the commissioning of the line and further optimization of production.

02
Fenco technology
Full process control. Maximum efficiency.
Line and plant design
Installation and commissioning
Staff training
03
More about the solution
Engineering depth without common phrases
Pre-design and feasibility assessment
Before investing, Fenco reviews the feasibility of the project, production flows, available space and energy capabilities of the site.
- Preliminary diagrams and 3D design
- Performance calculation
- Rating utilities: electricity, water, steam and compressed air
Turnkey factories
Fenco acts as the main contractor for complex enterprises: technological lines, industrial design, water and wastewater treatment, and, if necessary, agronomic support.
Quality control and acceptance
The project is accompanied by a dedicated manager. The equipment is inspected at the stages of production, pre-assembly, FAT, packaging, delivery and final SAT at the customer site.
- Hygienic design EHEDG and 3-A
- FAT - Factory Acceptance Test
- SAT - Site Acceptance Test
Warranty, laboratory and modernization
The equipment is covered by a 12 month warranty from delivery. Laboratory tests, scheduled maintenance and modernization of existing lines are available to improve quality and reduce operating costs.
The material was prepared based on the official page of the manufacturer Fenco Food Machinery. Open source ↗
05
How we work
From task to stable production
We define the product, performance and quality requirements.
We select the optimal technology, balance of water and energy.
We manufacture equipment and assemble the line into a single complex.
We train the team and bring production to design mode.
FENCO CENTRAL ASIA & CAUCASUS