Raw material and product research
01
Engineering solutions
Before manufacturing the equipment, we check the feasibility of the project, calculate the technology and resources, and then create an accurate 3D layout of the future production.

02
Fenco technology
Full process control. Maximum efficiency.
Material and energy balance
3D layout in an accessible building
Calculation of water, steam, air and electricity
03
More about the solution
Engineering depth without common phrases
Pre-project study
Engineers study raw material characteristics, formulation, seasonality, required throughput and existing site limitations.
Technological and energy calculations
The material balance shows the movement of product and waste, and the energy balance shows the need for water, steam, cold, compressed air and electricity.
Realistic 3D layout
The three-dimensional model allows you to check access, maintenance, sanitary areas, logistics and the relative position of equipment in advance.
Clear basis for investment
The client receives a technical concept on which to make an investment decision, plan the building and coordinate utility connections.
The material was prepared based on the official page of the manufacturer Fenco Food Machinery. Open source ↗
05
How we work
From task to stable production
We define the product, performance and quality requirements.
We select the optimal technology, balance of water and energy.
We manufacture equipment and assemble the line into a single complex.
We train the team and bring production to design mode.
FENCO CENTRAL ASIA & CAUCASUS


